Well, here is my latest project - completely stripped, and just about ready to start going forward again.
In addition to the stripping back, I've...
- ground out all the gel crazing and cracks
- cleaned up and prepared all the holes (and there are a lot!!) ready for filling
- prepared a couple of areas of more significant damage on the gunwhales for re-fibreglassing
- removed the inner skin of the roof lining along with all the rotten / soaking balsa
- had all the interior surfaces sandblasted to remove the oil paint that was applied by a previous owner
The priority jobs now are...
- refit and fibre-in the roof lining; I plan to use 1cm closed cell foam to try and recreate the slight convex shape of the roof
- repair the damaged areas, re-gelcoat the ground out cracks and fill all the holes
- sand and prepare the exterior gelcoat ready for a new coat of polyester paint
- repair the Yamaha 60 that is waiting patiently to get fitted to the transom!
As I've now finished my other mini-project, a 13ft Dory I hope to accelerate and make the most of the summer.
thanks for reading, Tim
Another 535 refurb!
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Another 535 refurb!
You do not have the required permissions to view the files attached to this post.
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Re: Another 535 refurb!
A couple more photos of the work I've done so far:
You do not have the required permissions to view the files attached to this post.
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Re: Another 535 refurb!
Refurb coming on slowly... as well as spending the weekend sanding the interior and preparing more holes for filling I've now cut out the houdini hatch
to be replaced by a proper sealed storm hatch. The easier access will make handling the bow anchor safer and the tinted perspex will let more light into the cabin. The only challenge is it is quite heavy so I am going to make a frame out of 20x40 steel box section which I can rivet the frame of the hatch to, and glass that into the underside of the roof. I've also cut out a piece to fit a permanent roof vent. I hope it all works!
You do not have the required permissions to view the files attached to this post.
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Re: Another 535 refurb!
I don't know how many hours I've put into this now but its coming on...
The damaged sections are now repaired and all the holes filled (there were hundreds!) and am in the process of getting the exterior finish to a state where I can paint, which is quite time consuming to get a good clean finish. I replaced the console ply insert and custom cut it to fit my steering and rev counter before it went in so I can properly seal the wood from the elements, and thats all now fibreglassed in.
Have used epoxy for all the repairs which hasn't been cheap but seems worth it, though the time you get to work with it seems very random... sometimes it burns out and soldifes in your hand and you have to go make another batch, other times it takes an age to go off! I've been measuring the ratios accurately so not sure but its all learning.
Still the storm hatch to fit but I've got the box section steel and the welder ready, and now just need to decide if I need to waterproof-rivet the frame into the roof or whether the glass fibre will be enough to hold it on its own.
Oh and a new door on order.
The damaged sections are now repaired and all the holes filled (there were hundreds!) and am in the process of getting the exterior finish to a state where I can paint, which is quite time consuming to get a good clean finish. I replaced the console ply insert and custom cut it to fit my steering and rev counter before it went in so I can properly seal the wood from the elements, and thats all now fibreglassed in.
Have used epoxy for all the repairs which hasn't been cheap but seems worth it, though the time you get to work with it seems very random... sometimes it burns out and soldifes in your hand and you have to go make another batch, other times it takes an age to go off! I've been measuring the ratios accurately so not sure but its all learning.
Still the storm hatch to fit but I've got the box section steel and the welder ready, and now just need to decide if I need to waterproof-rivet the frame into the roof or whether the glass fibre will be enough to hold it on its own.
Oh and a new door on order.
You do not have the required permissions to view the files attached to this post.
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Re: Another 535 refurb!
A few pictures of the first part of the roof repair...
Drilled 3 holes (front, centre and rear) for each of the 7 batons to get the shape of the roof...
Epoxied the 7 x 12mm marine ply stringers to the roof and screwed through the batons to pull the roofline into the original shape.
Closed cell foam inserts epoxied into place and all GRP'd in.
Each stringer is placed to act as a reinforcement base for new stainless rails and turn-buttons for the cover on the roof, the holes for which are drilled oversize, filled with epoxy and then drilled out again to the correct diameter.
Drilled 3 holes (front, centre and rear) for each of the 7 batons to get the shape of the roof...
Epoxied the 7 x 12mm marine ply stringers to the roof and screwed through the batons to pull the roofline into the original shape.
Closed cell foam inserts epoxied into place and all GRP'd in.
Each stringer is placed to act as a reinforcement base for new stainless rails and turn-buttons for the cover on the roof, the holes for which are drilled oversize, filled with epoxy and then drilled out again to the correct diameter.
You do not have the required permissions to view the files attached to this post.
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Re: Another 535 refurb!
Made a start on re-coring the main roof where I am also replacing the standard Houdini hatch with a proper storm hatch... Luxury!!
In order to take the extra weight I've welded up a frame out of 20x20x2 mild steel box section, which I will epoxy to the ceiling and GRP in. The new storm hatch will be waterproof-riveted to this and sealed in.
To keep it in place tight against the ceiling while I glue and GRP it in I made up a wooden frame which has worked out really well (so far!). This does flatten out a natural curve of the roofline in the centre which wants to pop up but I think this will be ok once its all glued and GRP'd. If not I'll have to cut it along the centre line and re-stitch it together.
In order to take the extra weight I've welded up a frame out of 20x20x2 mild steel box section, which I will epoxy to the ceiling and GRP in. The new storm hatch will be waterproof-riveted to this and sealed in.
To keep it in place tight against the ceiling while I glue and GRP it in I made up a wooden frame which has worked out really well (so far!). This does flatten out a natural curve of the roofline in the centre which wants to pop up but I think this will be ok once its all glued and GRP'd. If not I'll have to cut it along the centre line and re-stitch it together.
You do not have the required permissions to view the files attached to this post.
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Re: Another 535 refurb!
All the cabin roof now structurally done, the metal frame holds the extra weight of the storm hatch comfortably.
Just got to fit the anchor light, roof vent, VHF aerial, 2x solar panels and a cable gland and then fill in the gaps between the ceiling stringers with closed cell foam inserts and GRP over the ceiling to hold it all together then the boat is pretty much ready for prepping for paint... many hours of sanding ahead!!
Here's a mock up of it so far:
Just got to fit the anchor light, roof vent, VHF aerial, 2x solar panels and a cable gland and then fill in the gaps between the ceiling stringers with closed cell foam inserts and GRP over the ceiling to hold it all together then the boat is pretty much ready for prepping for paint... many hours of sanding ahead!!
Here's a mock up of it so far:
You do not have the required permissions to view the files attached to this post.
-
Whammers
- Posts: 134
- Joined: Wed Sep 24, 2014 2:30 pm
Re: Another 535 refurb!
Nice job on the roof repair. I'm glad I didn't have to do that on mine!
I've got off quite lightly with GRP repairs - not many were needed on Meggy.
Keep the posts coming. It's always good to share ideas.
I've got off quite lightly with GRP repairs - not many were needed on Meggy.
Keep the posts coming. It's always good to share ideas.
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Re: Another 535 refurb!
Started working on her again this summer, although it feels like I am going backwards!
Decided to redesign the interior to make it more suitable for sleeping 2 and in doing so I investigated the floor and found all the wood core to be rotten - there was a hole cut in for a sender unit of some kind (not sure if thats standard?!) but it wasn't fitted with the wood sealed with epoxy so evidently its let water creep through. So out it all came...
I decided then to improve the design of the drainage and so epoxied in a plastic pipe over which I will lay a new fibreglass floor using closed cell foam to build it up and a layer of thin ply to give me a nice flat surface, over which I will lay a sheet of GRP. The pipe means there should be no water gets into the actual cabin area, it drains down through the pipe and out under the deck to the bilge pump.
Hopefully that is the last bit of removal I do - there's not a lot left to remove!
Decided to redesign the interior to make it more suitable for sleeping 2 and in doing so I investigated the floor and found all the wood core to be rotten - there was a hole cut in for a sender unit of some kind (not sure if thats standard?!) but it wasn't fitted with the wood sealed with epoxy so evidently its let water creep through. So out it all came...
I decided then to improve the design of the drainage and so epoxied in a plastic pipe over which I will lay a new fibreglass floor using closed cell foam to build it up and a layer of thin ply to give me a nice flat surface, over which I will lay a sheet of GRP. The pipe means there should be no water gets into the actual cabin area, it drains down through the pipe and out under the deck to the bilge pump.
Hopefully that is the last bit of removal I do - there's not a lot left to remove!
You do not have the required permissions to view the files attached to this post.
-
EvangelicalAtheist
- Posts: 19
- Joined: Thu Jan 02, 2014 11:33 am
- Yahoo Messenger: tim.marshallking
- Location: Norfolk
- Skype: EvangelicalAtheist
Re: Another 535 refurb!
Took advantage of the lower temps today to install a new floor in the cabin.
A layer of GRP mat first to strengthen the hull, and then closed cell foam in different thicknesses to try and flatten the floor surface a little.
Tomorrow I will smooth the transitions between the different foams and lay down another layer of mat followed by thick woven GRP mat to finish.
Got some rubber flooring to put in when its all done to finish it off.
A layer of GRP mat first to strengthen the hull, and then closed cell foam in different thicknesses to try and flatten the floor surface a little.
Tomorrow I will smooth the transitions between the different foams and lay down another layer of mat followed by thick woven GRP mat to finish.
Got some rubber flooring to put in when its all done to finish it off.
You do not have the required permissions to view the files attached to this post.